Power Interruption Schedules
February 8, 2025 (Saturday)
8:00 AM - 5:00 PM
Payouting of Three Phase Line
and Clearing of Lines
Areas Affected
Portion of BAYOMBONG (Cabuaan, Casat, Portion of La Torre South, and La Torre North)
Whole Municipality of AMBAGUIO
February 7, 2025
8:00 AM - 5:00 PM
Three Phase Line Rotten Poles replacement
Conversion of line due to building construction & vegetation clearing
Areas Affected
Portion of VILLAVERDE (Poblacion, Bintawan Norte, Ibung, Nagbitin, Ocapon, Cabuluan, Pieza, & Sawmill)
Janaury 17, 2025 (Friday)
8:00 AM - 5:00 PM
Replacement of rotten pole,
relocation of lines, and clearing of lines
Areas Affected
Portion of STA. FE (Atbu, Bacneng, Balite, Baliling, Buyasyas, Imugan, Malico, Poblacion, Sinapaoan, Tactac, and Villa Flores)
January 17, 2025 (Friday)
8:00 AM - 5:00 PM
Payouting at Tiblac and Clearing of Lines
Areas Affected
Feeder 3, Bayombong Substation
Portion of BAYOMBONG (Canabuan, Casat, Portion of La Torre South, and La Torre North)
Whole Municipality of AMBAGUIO
January 11, 2024 (Saturday)
8:00 AM - 5:00 PM
Implementation of Sitio Electrification Program (SEP)
Areas Affected
Kakiduguen, Kasibu
December 12, 2024 (Thursday)
8:00 AM - 5:00 PM
Repair of typhoon-damaged distribution line at Tiblac, AM; Pay-outing of new conductor wires; Clearing of obstructions
Areas Affected
Sitio Pawac, and Jamboree, Bayombong
Whole Municipality of AMBAGUIO
December 12, 2024 (Thursday)
8:00 AM - 11:00 AM
Repair of typhoon damages on Feeder 3 backbone line
Areas Affected
Portion of Bagabag (Pogonsino, Tuao North, Tuao South, Baretbet, Villa Quirino, San Pedro, San Geronimo, and Villa Coloma)
December 6, 2024 (Friday)
8:00 AM - 12:00 PM
Replacement of Broken Poles
Areas Affected
Portion of Malasin
Municipal Town Hall of Dupax del Norte
Dupax del Norte District Hospital and
Brgy. Ineangan
November 30, 2024 (Saturday)
8:00 AM - 1:00 PM
Replacement of Broken Pole
Areas Affected
Portion of Roxas, Solano
November 30, 2024 (Saturday)
8:00 AM - 1:00 PM
Replacement of Broken Pole
Areas Affected
Portion of SOLANO
(Tucal, San Manuel, San Juan)
November 15, 2024 (Friday)
8:00 AM - 5:00 PM
Relocation of pole/lines due to road widening (requested by DPWH)
Areas Affected
Purok 1, Kirang, Aritao
Portion of KAYAPA (Amelong Labeng, Baan, Besong, Cabanglasan, Kayapa Proper East, Kayapa Proper West, Pampang, Pangawan, Pingkian, Talecabcab, Alang-Salacsac, Castillo Village, Lawigan, and Tidang Village)
November 15, 2024 (Friday)
8:00 AM - 5:00 PM
Clearing and relocation of pole
Areas Affected
Portion of BAMBANG (Highway Homestead, Macate, Abian, Abinganan, Villaluz, Sto. Domingo, Magapuy, Sto. Domingo West, Manamtam, Magsaysay Hill, Portion of Banggot, and Calaocan)
November 15, 2024 (Friday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Didipio and portion of Capisaan, Kasibu
November 14, 2024 (Thursday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Pao, Kasibu
November 13, 2024 (Wednesday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Tadji and Tukod, Kasibu
November 12, 2024 (Tuesday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Kakiduguen, Kasibu
November 12, 2024 (Tuesday)
8:00 AM - 12:00 PM
Correction of Leaned Triple Circuit Assemblies
Areas Affected
Portion of BAGABAG
(Kinacao, Baretbet, & Villaros)
Whole Municipality of DIADI
November 12, 2024 (Tuesday)
8:00 AM - 5:00 PM
Backbone Line Rahabilitation (Replacement of Rotten Wood Pole & Conversion of Line)
Areas Affected
Portion of BAGABAG (Pogonsino, Tuao North, Tuao South, Baretbet, Villa Quirino, San Pedro, San Geronimo, & Villa Coloma)
November 7, 2024 (Thursday)
8:00 AM to 5:00 PM
Pay-outing of 3 phase line and clearing of lines
Areas Affected
Sitio Pawac and Jamboree, Masoc, Bayombong
Whole Municipality of Ambaguio
October 30, 2024 (Wednesday)
8:00 AM - 10:00 AM
Tapping of Sitio Electrification Project
Areas Affected
Purok 4, Commonal, Solano
October 31, 2024 (Thursday)
8:00 AM - 5:00 PM
Backbone line relocation due to road widening, vertical clearance correction & replacement of rotten crossarms
Areas Affected
National Highway, Baretbet, Bagabag
October 31, 2024 (Thursday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Cabuaan and Casat, Bayombong
October 30, 2024 (Wednesday)
8:00 AM - 5:00 PM
Relocation and Additional Pole
Clearing of Lines
Areas Affected
Poblacion, Ambaguio
October 26, 2024 (Saturday)
8:00 AM - 1:00 PM
Tapping of Sitio Electrification Project
Areas Affected
Purok 4, Commonal, Solano
October 25, 2024 (Friday)
8:00 AM - 5:00 PM
Timpuyog - Clearing of Lines
Areas Affected
Portion of Salinas and Pallas, Bambang
Nanciakan, Kayapa
October 25, 2024 (Friday)
8:00 AM - 5:00 PM
Pay-outing of 3 phase line and
clearing of lines
Areas Affected
Sitio Pawac and Jamboree, Bayombong
Whole Municipality of AMBAGUIO
October 22, 2024 (Tuesday)
8:00 AM - 1:00 PM
Tapping of Sitio Electrification Project
Areas Affected
Portion of KASIBU (Catarawan, Biyoy, Kakiduguen, Bilet, Camamasi)
October 18, 2024 (Friday)
8:30 AM - 4:30 PM
Clearing of Lines
Areas Affected
Upper Magsaysay and Sitio Papappa, Bayombong
October 17, 2024 (Thursday)
8:00 AM - 5:00 PM
Pay-outing of 3 phase line
Areas Affected
Portion of BAYOMBONG
(Sitio Pawac and Jamboree)
Whole Municipality of AMBAGUIO
October 16, 2024 (Wednesday)
8:00 AM - 12:00 NN
EMERGENCY POWER INTERRUPTION
Re-routing of Line due to Building Construction
Areas Affected
Portion of Gabut, Dupax del Sur
Portion of BAMBANG (Mauan, Indiana, Aliaga, Almaguer South, Almaguer North, NVAT, NVPH, and portion of San Antonio North)
October 15, 2024 (Tuesday)
8:00 AM - 5:00 PM
Pay-outing of 3 phase line
Areas Affected
Portion of BAYOMBONG
(Sitio Pawac and Jamboree)
Whole Municipality of AMBAGUIO
October 11, 2024 (Friday)
8:00 AM to 5:00 PM
Clearing of Line and Replacement of Insulator and Defective Cutouts
Areas Affected
Feeder 4 Bambang Substation
-San Antonio North
-San Antonio South
-Whole Municipality of Dupax del Sur & Del Norte
-Brgy. Nantawakan, Kasibu
October 3, 2024 (Thursday)
6:00 AM - 12:00 NN
Clearing of Line
Areas Affected
Portion of SOLANO (Bagahabag, Quezon, Quirino, and Poblacion South)
Whole Municipality of QUEZON
September 28, 2024 (Saturday)
8:00 AM - 12:00 PM
Construction of primary line on existing 15 poles secondary line. Construction of primary line assembly at tapping pole
Areas Affected
Purok Diamond, Bintawan Norte, Villaverde
September 28, 2024 (Saturday)
7:00 AM - 7:30 AM & 6:30 PM - 7:00 PM
Commissioning of NGCP 100 mva Station Service Revenue Metering
Areas Affected
Whole Province of NUEVA VIZCAYA
except Alfonso Castañeda
September 27, 2024 (Friday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Portion of KASIBU (Cappit, Malabing Valley, Didipio, Tadji, Wangal, Capisaan, Alimit, Tukod)
September 25, 2024 (Tuesday)
8:00 AM â 5:00 PM
Relocation of poles due to DPWH Road Widening and Clearing of Lines
Areas Affected
Portion of KAYAPA (Tidang Village, Castillo Village, Pampang, Tubongan, Besong, Kayapa Proper West, Kayapa Proper East, Amelong Labeng, Balangabang, Pangawan, Talecabcab)
September 21, 2024 (Saturday)
8:00 AM - 12:00 PM
Implementation of Sitio Electrification Project
Areas Affected
Portion of BAMBANG
(Portion of San Fernando (Sitio Malayo) and Portion of Abinganan)
September 20, 2024 (Friday)
8:00 AM - 5:00 PM
Correction of low vertical lines, replacement of crossarm, and
clearing of lines
Areas Affected
Portion of ARITAO (Beti, Canarem, Comon, Poblacion, (Bagbag), Santa Clara, and Yaway)
Portion of STA. FE (Bantinan and Canabuan)
September 18, 2024 (Wednesday)
8:00 AM - 5:00 PM
Replacement of rotten pole and clearing of lines
Areas Affected
Portion of KASIBU (Bilet, Biyoy, Camamasi, Catarawan, Dine, Pao, and Paquet)
September 18, 2024 (Wednesday)
8:00 AM - 5:00 PM
Conversion and clearing of lines
Areas Affected
Portion of BAYOMBONG
(Purok 5 & 6, Bonfal East)
September 14, 2024 (Saturday)
8:00 AM - 4:00 PM
Conversion of Primary Line and Re-tightening of Bushing and Clearing of Lines
Areas Affected
Portion of BAYOMBONG
(Purok 2 & 3, Barangay Salvacion)
September 13, 2024 (Friday)
8:00 AM - 5:00 PM
Replacement of rotten poles, vertical clearance correction, and vegetation clearing
Areas Affected
Portion of Villaros, Bagabag
Whole Municipality of DIADI
September 14, 2024 (Saturday)
9:00 AM - 5:00 PM
Clearing of Line
Areas Affected
Portion of KAYAPA
(Tubungan and Pangawan)
September 12, 2024 (Thursday)
9:00 AM - 5:00 PM
Clearing of Line
Areas Affected
Bantinan, Sta. Fe
September 11, 2024 (Wednesday)
8:00 AM - 5:00 PM
Relocation of Pole due to building Construction and Clearing of line
Areas Affected
Portion of STA. FE (Malico and Sta. Rosa)
September 10, 2024 (Tuesday)
8:00 AM - 5:00 PM
Clearing of Line
Areas Affected
Portion of STA. FE (Canabuan and Cauco)
September 7, 2024 (Saturday)
8:00 AM - 3:00 PM
Clearing of Line
Areas Affected
Ponce Colocol, District 4, Bayombong
September 5, 2024 (Thursday)
8:30 AM - 2:30 PM
Clearing of Line
Areas Affected
Sta. Rosa, Bayombong
September 5, 2024 (Thursday)
6:00 AM - 6:30 AM & 5:30 PM - 6:00 PM
NGCP to implement shifting of loads
Areas Affected
Whole Municipality of BAMBANG, ARITAO, DUPAX DEL NORTE, DUPAX DEL SUR, KASIBU, STA. FE, and KAYAPA
September 4, 2024 (Thursday)
8:00 AM - 5:00 PM
Clearing of Obstruction of Line
Areas Affected
Unib, Sta. Fe
September 5, 2024 (Thursday)
8:00 AM - 5:00 PM
Replacement of Rotten and Clearing of Obstruction of Line
Areas Affected
Portion of STA. FE
(Zigzag, Tactac, Atbu, Dalton)
September 7, 2024 (Saturday)
8:00 AM - 5:00 PM
Clearing of Obstruction of Line
Areas Affected
Portion of ARITAO (Tabueng and Tucanon)
September 6, 2024 (Friday)
8:00 AM - 5:00 PM
Relocation of poles and clearing of lateral lines
Areas Affected
Portion of SOLANO (Portion of Aggub, Bangar, Bascaran, Concepcion, Curifang, Dadap, and Roxas)
Salubris Medical Center
September 5, 2024 (Thursday)
8:00 AM - 5:00 PM
Relocation of poles and
clearing of lateral lines
Areas Affected
Portion of SOLANO (Tucal, Uddiawan, Communal, San Juan, and Portion of San Luis)
Whole Municipality of VILLAVERDE
September 4, 2024 (Wednesday)
8:00 AM - 5:00 PM
Relocation of poles and
clearing of lateral lines
Areas Affected
Portion of QUEZON
(Brgy. Caliat and Nalubbunan)
August 31, 2024 (Saturday)
8:00 AM - 5:00 PM
Relocation of poles and clearing of lateral lines
Areas Affected
Portion of SOLANO (Tucal, Uddiawan, Communal, San Juan, and portion of San Luis)
Whole Municipality of VILLAVERDE
August 29, 2024 (Thursday)
8:30 AM - 5:00 PM
Clearing of lateral lines
Areas Affected
Portion of BAYOMBONG (Brgy. Ipil-Cuneg)
August 28, 2024 (Wednesday)
8:30 AM - 5:00 PM
Clearing of lateral lines
Areas Affected
Portion of BAYOMBONG (Brgy. Cabuaan)
August 27, 2024 (Tuesday)
8:30 AM - 5:00 PM
Clearing of lateral lines
Areas Affected
Portion of BAYOMBONG
(Paitan and Bansing)
August 24, 2024 (Saturday)
8:30 AM - 5:00 PM
Clearing of lateral lines
Areas Affected
Portion of BAYOMBONG
(Purok 5, Bonfal West)
August 22, 2024 (Thursday)
8:00 AM - 5:00 PM
Replacement of Rotten Pole
Areas Affected
Portion of SOLANO (Portion of Poblacion North, Portion of Quirino, Portion of Roxas (along Magsaysay St., Binacao St., Aratal St., Silawan St.) Jollibee, Greenwich, Ataw, Centro Mall, LGU Solano)
August 22, 2024 (Thursday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Portion of ARITAO (Kirang Surong, Cutar, Nagcuartelan, Bone North, Bone South, Ocao-Capiniaan, Balite, and Calitlitan)
Portion of STA. FE (Atbu, Bacnenng, Balite, Baliling, Buyasyas, Imugan, Poblacion, Sinapaoan, Tactac, Villaflores)
Malico, San Nicolas, Nueva Vizcaya
August 17, 2024 (Saturday)
8:00 AM - 12:00 PM
Sitio Electrification Project Implementation
Areas Affected
Portion of DIADI
(Purok 5, Namamparan, and Purok 1, Arwas)
August 9, 2024 (Friday)
8:00 AM - 5:00 PM
Relocation of pole/lines due to road widening (requested by DPWH)
Areas Affected
Portion of Poblacio, Aritao (Benguet - Nueva Vizcaya Road)
Portion of the KAYAPA (Amelong Labeng, Baan, Besong, Cabanglasan, Kayapa Proper East, Kayapa Proper West, Pampang, Pangawan, Pingkian, Talicabcab, Alang-Salacsac, Castillo Village, Lawigan, and Tidang Village)
August 8, 2024 (Thursday)
8:00 AM - 5:00 PM
Erection of additional pole, correction of low vertical clearance, and backbone line vegetation clearing
Areas Affected
Portion of ARITAO (Kirang Surong, Cutar, Nagcuartelan, Bone North, Bone South, Ocao- Capiniaan, Balite, and Calitlitan)
Portion of STA. FE (Atbu, Bacneng, Balite, Baliling, Buyayas, Imugan, Poblacion, Sinapaoan, Tactac, and Villa Flores)
Malico, San Nicolas, Pangasinan
August 3, 2024 (Saturday)
8:00 AM - 5:00 PM
Backbone line vegetation clearing
Areas Affected
Portion of DIADI (Arwas, Escoting, Langka, Namamparan, Pinya, San Luis, San Pablo, Poblacion, Villa Aurora, and Villa Florentino)
August 3, 2024 (Saturday)
8:30 AM - 4:30 PM
Lateral line vegetation clearing
Areas Affected
Purok 7, Bonfal Proper, Bayombong
August 2, 2024 (Friday)
8:30 AM - 2:00 PM
Lateral line vegetation clearing
Areas Affected
Inaldo St., Bonfal East, Bayombong
August 2, 2024 (Friday)
8:00 AM - 5:00 PM
Backbone vegetation clearing
Areas Affected
Portion of KASIBU
(Alimit, Portion of Capisaan, and Didipio)
August 1, 2024 (Thursday)
6:00 AM - 6:00 PM
Relocation of 69kv Line of FCF Minerals
Areas Affected
Runruno, Quezon
July 30, 2024 (Tuesday)
8:00 AM - 5:00 PM
Line Maintenance of Oceana Gold 69kv Line
Areas Affected
Portion of BAMBANG
(Portion of San Fernando, Mabuslo, Labni)
Whole Municipality of KASIBU
July 27, 2024 (Saturday)
8:00 AM - 5:00 PM
Backbone Line Vegetation Clearing
Areas Affected
Portion of DIADI (Namamparan, Daldalayap, Poblacion, San Luis, Villa Aurora, Villa Florentino, Nag tim-og, Cabra, Pinya, Langka, Escoting, San Pablo, Arwas, Butao, Limbo)
July 25, 2024 (Thursday)
8:00 AM - 5:00 PM
Backbon line vertical clearance correction, replacement of rotten wood pole & crossarms and vegetation clearing
Areas Affected
Portion of BAGABAG (San Geronimo, San Pedro, Villa Quirino, Tuao North, Tuao South & Pogonsino)
July 26, 2024 (Friday)
8:00 AM - 5:00 PM
Line Maintenance and Clearing of Line
Areas Affected
Portion of ARITAO (Bagbag, Tucanon, Comon, Beti, Latar, Yaway, Sta. Clara, Anayo, Canarem, Canabuan)
Portion of STA. FE (Canabuan and Bantinan)
July 25, 2024 (Thursday)
8:00 AM - 5:00 PM
Line Maintenance and Clearing
Areas Affected
Portion of ARITAO (Kirang and Baan)
Whole Municipality of KAYAPA (except San Fabian, Acacia, Mapayao, Binalian, Babadi, Pinayag, Latbang, Nansiakan)
July 19, 2024 (Friday)
8:00 AM - 5:00 PM
EMERGENCY POWER INTERRUPTION
Transfer of Distribution Line, Rehabilitation and Clearing of Lines
Areas Affected
Portion of BAYOMBONG (Buenavista (Vista Hill), Busilac, Magsaysay)
Region II Trauma and Medical Center
July 23, 2024 (Tuesday)
6:00 AM - 6:00 PM
NGCP Preventive Maintenance
Areas Affected
WHOLE PROVINCE OF NUEVA VIZCAYA
July 19, 2024 (Friday)
8:00 AM - 5:00 PM
Clearing of Line
Areas Affected
Portion of BAMBANG (Depensa Calaocan, CFM, Homestead, San Leonardo, Barat, Salinas, Pallas)
Portion of KAYAPA (San Fabian, Acacia, Mapayao, Binalian, Babadi, Pinayag, Latbang, Nansiakan)
July 18, 2024 (Thursday)
8:00 AM - 5:00 PM
Termination of 3 phase line from old to new lines, Clearing of obstruction of lines, and installation of isolation fuse cut outs
Areas Affected
Portion of STA. FE (Poblacion, Dalton, Tactac, Atbu, Imugan, Unib, Baracbac, Malico)
Malico, San Nicolas, Pangasinan
July 5, 2024 (Friday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Portion of BAMBANG
(San Fernando, Labni, and Mabuslo)
Whole Municipality of KASIBU
July 5, 2024 (Friday)
9:00 AM - 1:00 PM
Installation of Fuse at Bambang Substation
Areas Affected
Whole Municipality of BAMBANG (except Indiana, Mauan, Aliaga, Almaguer North, Almaguer South, Portion of San Antonio North and NVPH)
Whole Municipality of KASIBU, DUPAX DEL NORTE, and DUPAX DEL SUR
Portion of KAYAPA (San Fabian, Mapayao, Binalian, Babadi, Pinayag, Latbang)
Magapuy, Bayombong
July 5, 2024 (Friday)
9:00 AM - 1:00 PM
Correction of CT Ratio at Solano Substation
Areas Affected
Whole Municipality of SOLANO
(except Aggub, Commonal, Tucal, Uddiawan, San Juan, Portion of San Luis, Quirino, Poblacion South, Public Market and Breads N Bites to 24/7)
Whole Municipality of QUEZON
June 28, 2024 (Friday)
8:00 AM to 5:00 PM
Replacement of broken pole and Clearing of obstruction of lines
Areas Affected
Portion of Aritao ( Balite and Calitlitan)
Portion of Sta. Fe (Atbu, Bacneng, Balite, Baliling, Buyasyas, Imugan, Poblacion, Sinapaoan, Tactac, and Villa Flores)
Malico, San Nicolas, Pangasinan
June 27, 2024 (Thursday)
8:00 AM to 5:00 PM
Replacement of defective transformers, load splitting of overloaded transformers, and clearing of obstruction of lines
Areas Affected
Poblacion, Aritao
Public Market, Old Road Kirang
June 27, 2024 (Thursday)
8:10 AM - 12:00 NN
Termination of Primary Jumpers and Clearing of Lines
Areas Affected
Portion of BAYOMBONG (Bansing, Don Domingo Maddela, Don Mariano Perez, portion of Don Mariano Marcos, Don Tomas Maddela, Portion of La Torre South, Luyang, Paitan, Salvacion, San Nicolas, and Vista Alegre)
NVSU Bayombong, DepEd
June 21, 2024 (Friday)
11:00 AM - 2:00 PM
Replacement of broken pole
Areas Affected
Portion of BAMBANG (Portion of San Antonio North and San Antonio South)
Whole Municipality of DUPAX DEL NORTE and DUPAX DEL SUR
June 22, 2024 (Saturday)
8:00 AM -10:00 AM
Replacement of Broken Crossarm
Areas Affected
Portion of BAMBANG
(Highway Homestead, Macate, Abian, Abinganan, Villaluz, Sto. Domingo, Magapuy, Sto. Domingo West, Manamtam, Magsaysay Hill, Portion of Banggot and Calaocan)
June 20, 2024 (Thursday)
8:00 AM - 5:00 PM
Clearing of Obstruction on Backbone Line
Areas Affected
Portion of Diadi
(Bugnay, San Luis, Villa Aurora and Villa Florentino)
June 21, 2024 (Friday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Portion of SOLANO
(Portion of Aggub, Bangar, Bascaran, Concepcion, Curifang, Dadap, and Roxas)
Salubris
June 20, 2024 (Thursday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Bascaran, Solano
June 19, 2024 (Wednesday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Portion of QUEZON
(Kinalabasa and Busat, Runruno)
June 18, 2024 (Tuesday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Portion of SOLANO
(Portion of San Luis, Aggub, Tucal, Uddiawan, San Juan, and Commonal)
June 22, 2024 (Saturday)
8:00AM to 5:00PM
Clearing of Line
Areas Affected
District 4, Bayombong
June 20, 2024 (Thursday)
8:00AM to 5:00PM
Clearing of Line
Areas Affected
Purok 6, Salvacion, Bayombong
June 18, 2024 (Thursday)
8:00 AM to 5:00 PM
Clearing of Line
Areas Affected
Portion of Bayombong
(Portion of Salvacion and Portion of Don Mariano Perez)
June 14, 2024 (Friday)
8:00 AM - 5:00 PM
Clearing of obstruction on backbone and lateral line
Areas Affected
Portion of BAGABAG
(Calutlutan, Saranay, Sta. Lucia, Portion of Lantap, Bakir, Paniki, & Nangalisan)
June 14, 2024 (Friday)
8:00 AM - 5:00 PM
Clearing of Line and
Rehabilitation of Line
Areas Affected
Portion of BAYOMBONG
(Portion of San Nicolas, SMU High School, and Cathedral)
June 13, 2024 (Thursday)
8:00 AM - 5:00 PM
Clearing of Line
Areas Affected
Portion of BAYOMBONG
(La Torre South, Casat, Cabuaan)
June 12, 2024 (Wednesday)
8:00 AM - 5:00 PM
Clearing of Line and
Replacement of Rotten Pole
Areas Affected
Boliwao, Quezon