Power Interruption Schedules


February 8, 2025 (Saturday)
8:00 AM - 5:00 PM
Purpose

Payouting of Three Phase Line
and Clearing of Lines


Areas Affected

Portion of BAYOMBONG (Cabuaan, Casat, Portion of La Torre South, and La Torre North)

Whole Municipality of AMBAGUIO

February 7, 2025
8:00 AM - 5:00 PM
Purpose

Three Phase Line Rotten Poles replacement
Conversion of line due to building construction & vegetation clearing


Areas Affected

Portion of VILLAVERDE (Poblacion, Bintawan Norte, Ibung, Nagbitin, Ocapon, Cabuluan, Pieza, & Sawmill)

Janaury 17, 2025 (Friday)
8:00 AM - 5:00 PM
Purpose

Replacement of rotten pole,
relocation of lines, and clearing of lines


Areas Affected

Portion of STA. FE (Atbu, Bacneng, Balite, Baliling, Buyasyas, Imugan, Malico, Poblacion, Sinapaoan, Tactac, and Villa Flores)

January 17, 2025 (Friday)
8:00 AM - 5:00 PM
Purpose

Payouting at Tiblac and Clearing of Lines


Areas Affected

Feeder 3, Bayombong Substation

Portion of BAYOMBONG (Canabuan, Casat, Portion of La Torre South, and La Torre North)

Whole Municipality of AMBAGUIO

January 11, 2024 (Saturday)
8:00 AM - 5:00 PM
Purpose

Implementation of Sitio Electrification Program (SEP)


Areas Affected

Kakiduguen, Kasibu

December 12, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Repair of typhoon-damaged distribution line at Tiblac, AM; Pay-outing of new conductor wires; Clearing of obstructions


Areas Affected

Sitio Pawac, and Jamboree, Bayombong
Whole Municipality of AMBAGUIO

December 12, 2024 (Thursday)
8:00 AM - 11:00 AM
Purpose

Repair of typhoon damages on Feeder 3 backbone line


Areas Affected

Portion of Bagabag (Pogonsino, Tuao North, Tuao South, Baretbet, Villa Quirino, San Pedro, San Geronimo, and Villa Coloma)

December 6, 2024 (Friday)
8:00 AM - 12:00 PM
Purpose

Replacement of Broken Poles


Areas Affected

Portion of Malasin
Municipal Town Hall of Dupax del Norte
Dupax del Norte District Hospital and
Brgy. Ineangan

November 30, 2024 (Saturday)
8:00 AM - 1:00 PM
Purpose

Replacement of Broken Pole


Areas Affected

Portion of Roxas, Solano

November 30, 2024 (Saturday)
8:00 AM - 1:00 PM
Purpose

Replacement of Broken Pole


Areas Affected

Portion of SOLANO
(Tucal, San Manuel, San Juan)

November 15, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Relocation of pole/lines due to road widening (requested by DPWH)


Areas Affected

Purok 1, Kirang, Aritao

Portion of KAYAPA (Amelong Labeng, Baan, Besong, Cabanglasan, Kayapa Proper East, Kayapa Proper West, Pampang, Pangawan, Pingkian, Talecabcab, Alang-Salacsac, Castillo Village, Lawigan, and Tidang Village)

November 15, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Clearing and relocation of pole


Areas Affected

Portion of BAMBANG (Highway Homestead, Macate, Abian, Abinganan, Villaluz, Sto. Domingo, Magapuy, Sto. Domingo West, Manamtam, Magsaysay Hill, Portion of Banggot, and Calaocan)

November 15, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Clearing of Lines


Areas Affected

Didipio and portion of Capisaan, Kasibu

November 14, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Clearing of Lines


Areas Affected

Pao, Kasibu

November 13, 2024 (Wednesday)
8:00 AM - 5:00 PM
Purpose

Clearing of Lines


Areas Affected

Tadji and Tukod, Kasibu

November 12, 2024 (Tuesday)
8:00 AM - 5:00 PM
Purpose

Clearing of Lines


Areas Affected

Kakiduguen, Kasibu

November 12, 2024 (Tuesday)
8:00 AM - 12:00 PM
Purpose

Correction of Leaned Triple Circuit Assemblies


Areas Affected

Portion of BAGABAG
(Kinacao, Baretbet, & Villaros)

Whole Municipality of DIADI

November 12, 2024 (Tuesday)
8:00 AM - 5:00 PM
Purpose

Backbone Line Rahabilitation (Replacement of Rotten Wood Pole & Conversion of Line)


Areas Affected

Portion of BAGABAG (Pogonsino, Tuao North, Tuao South, Baretbet, Villa Quirino, San Pedro, San Geronimo, & Villa Coloma)

November 7, 2024 (Thursday)
8:00 AM to 5:00 PM
Purpose

Pay-outing of 3 phase line and clearing of lines


Areas Affected

Sitio Pawac and Jamboree, Masoc, Bayombong

Whole Municipality of Ambaguio

October 30, 2024 (Wednesday)
8:00 AM - 10:00 AM
Purpose

Tapping of Sitio Electrification Project


Areas Affected

Purok 4, Commonal, Solano

October 31, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Backbone line relocation due to road widening, vertical clearance correction & replacement of rotten crossarms


Areas Affected

National Highway, Baretbet, Bagabag

October 31, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Clearing of Lines


Areas Affected

Cabuaan and Casat, Bayombong

October 30, 2024 (Wednesday)
8:00 AM - 5:00 PM
Purpose

Relocation and Additional Pole
Clearing of Lines


Areas Affected

Poblacion, Ambaguio

October 26, 2024 (Saturday)
8:00 AM - 1:00 PM
Purpose

Tapping of Sitio Electrification Project


Areas Affected

Purok 4, Commonal, Solano

October 25, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Timpuyog - Clearing of Lines


Areas Affected

Portion of Salinas and Pallas, Bambang

Nanciakan, Kayapa

October 25, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Pay-outing of 3 phase line and
clearing of lines


Areas Affected

Sitio Pawac and Jamboree, Bayombong

Whole Municipality of AMBAGUIO

October 22, 2024 (Tuesday)
8:00 AM - 1:00 PM
Purpose

Tapping of Sitio Electrification Project


Areas Affected

Portion of KASIBU (Catarawan, Biyoy, Kakiduguen, Bilet, Camamasi)

October 18, 2024 (Friday)
8:30 AM - 4:30 PM
Purpose

Clearing of Lines


Areas Affected

Upper Magsaysay and Sitio Papappa, Bayombong

October 17, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Pay-outing of 3 phase line


Areas Affected

Portion of BAYOMBONG
(Sitio Pawac and Jamboree)

Whole Municipality of AMBAGUIO

October 16, 2024 (Wednesday)
8:00 AM - 12:00 NN
Purpose

EMERGENCY POWER INTERRUPTION
Re-routing of Line due to Building Construction


Areas Affected

Portion of Gabut, Dupax del Sur

Portion of BAMBANG (Mauan, Indiana, Aliaga, Almaguer South, Almaguer North, NVAT, NVPH, and portion of San Antonio North)

October 15, 2024 (Tuesday)
8:00 AM - 5:00 PM
Purpose

Pay-outing of 3 phase line


Areas Affected

Portion of BAYOMBONG
(Sitio Pawac and Jamboree)

Whole Municipality of AMBAGUIO

October 11, 2024 (Friday)
8:00 AM to 5:00 PM
Purpose

Clearing of Line and Replacement of Insulator and Defective Cutouts


Areas Affected

Feeder 4 Bambang Substation

-San Antonio North
-San Antonio South
-Whole Municipality of Dupax del Sur & Del Norte
-Brgy. Nantawakan, Kasibu

October 3, 2024 (Thursday)
6:00 AM - 12:00 NN
Purpose

Clearing of Line


Areas Affected

Portion of SOLANO (Bagahabag, Quezon, Quirino, and Poblacion South)

Whole Municipality of QUEZON

September 28, 2024 (Saturday)
8:00 AM - 12:00 PM
Purpose

Construction of primary line on existing 15 poles secondary line. Construction of primary line assembly at tapping pole


Areas Affected

Purok Diamond, Bintawan Norte, Villaverde

September 28, 2024 (Saturday)
7:00 AM - 7:30 AM & 6:30 PM - 7:00 PM
Purpose

Commissioning of NGCP 100 mva Station Service Revenue Metering


Areas Affected

Whole Province of NUEVA VIZCAYA
except Alfonso Castañeda

September 27, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Clearing of Lines


Areas Affected

Portion of KASIBU (Cappit, Malabing Valley, Didipio, Tadji, Wangal, Capisaan, Alimit, Tukod)

September 25, 2024 (Tuesday)
8:00 AM – 5:00 PM
Purpose

Relocation of poles due to DPWH Road Widening and Clearing of Lines


Areas Affected

Portion of KAYAPA (Tidang Village, Castillo Village, Pampang, Tubongan, Besong, Kayapa Proper West, Kayapa Proper East, Amelong Labeng, Balangabang, Pangawan, Talecabcab)

September 21, 2024 (Saturday)
8:00 AM - 12:00 PM
Purpose

Implementation of Sitio Electrification Project


Areas Affected

Portion of BAMBANG
(Portion of San Fernando (Sitio Malayo) and Portion of Abinganan)

September 20, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Correction of low vertical lines, replacement of crossarm, and
clearing of lines


Areas Affected

Portion of ARITAO (Beti, Canarem, Comon, Poblacion, (Bagbag), Santa Clara, and Yaway)

Portion of STA. FE (Bantinan and Canabuan)

September 18, 2024 (Wednesday)
8:00 AM - 5:00 PM
Purpose

Replacement of rotten pole and clearing of lines


Areas Affected

Portion of KASIBU (Bilet, Biyoy, Camamasi, Catarawan, Dine, Pao, and Paquet)

September 18, 2024 (Wednesday)
8:00 AM - 5:00 PM
Purpose

Conversion and clearing of lines


Areas Affected

Portion of BAYOMBONG
(Purok 5 & 6, Bonfal East)

September 14, 2024 (Saturday)
8:00 AM - 4:00 PM
Purpose

Conversion of Primary Line and Re-tightening of Bushing and Clearing of Lines


Areas Affected

Portion of BAYOMBONG
(Purok 2 & 3, Barangay Salvacion)

September 13, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Replacement of rotten poles, vertical clearance correction, and vegetation clearing


Areas Affected

Portion of Villaros, Bagabag

Whole Municipality of DIADI

September 14, 2024 (Saturday)
9:00 AM - 5:00 PM
Purpose

Clearing of Line


Areas Affected

Portion of KAYAPA
(Tubungan and Pangawan)

September 12, 2024 (Thursday)
9:00 AM - 5:00 PM
Purpose

Clearing of Line


Areas Affected

Bantinan, Sta. Fe

September 11, 2024 (Wednesday)
8:00 AM - 5:00 PM
Purpose

Relocation of Pole due to building Construction and Clearing of line


Areas Affected

Portion of STA. FE (Malico and Sta. Rosa)

September 10, 2024 (Tuesday)
8:00 AM - 5:00 PM
Purpose

Clearing of Line


Areas Affected

Portion of STA. FE (Canabuan and Cauco)

September 7, 2024 (Saturday)
8:00 AM - 3:00 PM
Purpose

Clearing of Line


Areas Affected

Ponce Colocol, District 4, Bayombong

September 5, 2024 (Thursday)
8:30 AM - 2:30 PM
Purpose

Clearing of Line


Areas Affected

Sta. Rosa, Bayombong

September 5, 2024 (Thursday)
6:00 AM - 6:30 AM & 5:30 PM - 6:00 PM
Purpose

NGCP to implement shifting of loads


Areas Affected

Whole Municipality of BAMBANG, ARITAO, DUPAX DEL NORTE, DUPAX DEL SUR, KASIBU, STA. FE, and KAYAPA

September 4, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Clearing of Obstruction of Line


Areas Affected

Unib, Sta. Fe

September 5, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Replacement of Rotten and Clearing of Obstruction of Line


Areas Affected

Portion of STA. FE
(Zigzag, Tactac, Atbu, Dalton)

September 7, 2024 (Saturday)
8:00 AM - 5:00 PM
Purpose

Clearing of Obstruction of Line


Areas Affected

Portion of ARITAO (Tabueng and Tucanon)

September 6, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Relocation of poles and clearing of lateral lines


Areas Affected

Portion of SOLANO (Portion of Aggub, Bangar, Bascaran, Concepcion, Curifang, Dadap, and Roxas)

Salubris Medical Center

September 5, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Relocation of poles and
clearing of lateral lines


Areas Affected

Portion of SOLANO (Tucal, Uddiawan, Communal, San Juan, and Portion of San Luis)

Whole Municipality of VILLAVERDE

September 4, 2024 (Wednesday)
8:00 AM - 5:00 PM
Purpose

Relocation of poles and
clearing of lateral lines


Areas Affected

Portion of QUEZON
(Brgy. Caliat and Nalubbunan)

August 31, 2024 (Saturday)
8:00 AM - 5:00 PM
Purpose

Relocation of poles and clearing of lateral lines


Areas Affected

Portion of SOLANO (Tucal, Uddiawan, Communal, San Juan, and portion of San Luis)

Whole Municipality of VILLAVERDE

August 29, 2024 (Thursday)
8:30 AM - 5:00 PM
Purpose

Clearing of lateral lines


Areas Affected

Portion of BAYOMBONG (Brgy. Ipil-Cuneg)

August 28, 2024 (Wednesday)
8:30 AM - 5:00 PM
Purpose

Clearing of lateral lines


Areas Affected

Portion of BAYOMBONG (Brgy. Cabuaan)

August 27, 2024 (Tuesday)
8:30 AM - 5:00 PM
Purpose

Clearing of lateral lines


Areas Affected

Portion of BAYOMBONG
(Paitan and Bansing)

August 24, 2024 (Saturday)
8:30 AM - 5:00 PM
Purpose

Clearing of lateral lines


Areas Affected

Portion of BAYOMBONG
(Purok 5, Bonfal West)

August 22, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Replacement of Rotten Pole


Areas Affected

Portion of SOLANO (Portion of Poblacion North, Portion of Quirino, Portion of Roxas (along Magsaysay St., Binacao St., Aratal St., Silawan St.) Jollibee, Greenwich, Ataw, Centro Mall, LGU Solano)

August 22, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Clearing of Lines


Areas Affected

Portion of ARITAO (Kirang Surong, Cutar, Nagcuartelan, Bone North, Bone South, Ocao-Capiniaan, Balite, and Calitlitan)

Portion of STA. FE (Atbu, Bacnenng, Balite, Baliling, Buyasyas, Imugan, Poblacion, Sinapaoan, Tactac, Villaflores)

Malico, San Nicolas, Nueva Vizcaya

August 17, 2024 (Saturday)
8:00 AM - 12:00 PM
Purpose

Sitio Electrification Project Implementation


Areas Affected

Portion of DIADI
(Purok 5, Namamparan, and Purok 1, Arwas)

August 9, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Relocation of pole/lines due to road widening (requested by DPWH)


Areas Affected

Portion of Poblacio, Aritao (Benguet - Nueva Vizcaya Road)

Portion of the KAYAPA (Amelong Labeng, Baan, Besong, Cabanglasan, Kayapa Proper East, Kayapa Proper West, Pampang, Pangawan, Pingkian, Talicabcab, Alang-Salacsac, Castillo Village, Lawigan, and Tidang Village)

August 8, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Erection of additional pole, correction of low vertical clearance, and backbone line vegetation clearing


Areas Affected

Portion of ARITAO (Kirang Surong, Cutar, Nagcuartelan, Bone North, Bone South, Ocao- Capiniaan, Balite, and Calitlitan)

Portion of STA. FE (Atbu, Bacneng, Balite, Baliling, Buyayas, Imugan, Poblacion, Sinapaoan, Tactac, and Villa Flores)

Malico, San Nicolas, Pangasinan

August 3, 2024 (Saturday)
8:00 AM - 5:00 PM
Purpose

Backbone line vegetation clearing


Areas Affected

Portion of DIADI (Arwas, Escoting, Langka, Namamparan, Pinya, San Luis, San Pablo, Poblacion, Villa Aurora, and Villa Florentino)

August 3, 2024 (Saturday)
8:30 AM - 4:30 PM
Purpose

Lateral line vegetation clearing


Areas Affected

Purok 7, Bonfal Proper, Bayombong

August 2, 2024 (Friday)
8:30 AM - 2:00 PM
Purpose

Lateral line vegetation clearing


Areas Affected

Inaldo St., Bonfal East, Bayombong

August 2, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Backbone vegetation clearing


Areas Affected

Portion of KASIBU
(Alimit, Portion of Capisaan, and Didipio)

August 1, 2024 (Thursday)
6:00 AM - 6:00 PM
Purpose

Relocation of 69kv Line of FCF Minerals


Areas Affected

Runruno, Quezon

July 30, 2024 (Tuesday)
8:00 AM - 5:00 PM
Purpose

Line Maintenance of Oceana Gold 69kv Line


Areas Affected

Portion of BAMBANG
(Portion of San Fernando, Mabuslo, Labni)

Whole Municipality of KASIBU

July 27, 2024 (Saturday)
8:00 AM - 5:00 PM
Purpose

Backbone Line Vegetation Clearing


Areas Affected

Portion of DIADI (Namamparan, Daldalayap, Poblacion, San Luis, Villa Aurora, Villa Florentino, Nag tim-og, Cabra, Pinya, Langka, Escoting, San Pablo, Arwas, Butao, Limbo)

July 25, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Backbon line vertical clearance correction, replacement of rotten wood pole & crossarms and vegetation clearing


Areas Affected

Portion of BAGABAG (San Geronimo, San Pedro, Villa Quirino, Tuao North, Tuao South & Pogonsino)

July 26, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Line Maintenance and Clearing of Line


Areas Affected

Portion of ARITAO (Bagbag, Tucanon, Comon, Beti, Latar, Yaway, Sta. Clara, Anayo, Canarem, Canabuan)

Portion of STA. FE (Canabuan and Bantinan)

July 25, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Line Maintenance and Clearing


Areas Affected

Portion of ARITAO (Kirang and Baan)

Whole Municipality of KAYAPA (except San Fabian, Acacia, Mapayao, Binalian, Babadi, Pinayag, Latbang, Nansiakan)

July 19, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

EMERGENCY POWER INTERRUPTION
Transfer of Distribution Line, Rehabilitation and Clearing of Lines


Areas Affected

Portion of BAYOMBONG (Buenavista (Vista Hill), Busilac, Magsaysay)

Region II Trauma and Medical Center

July 23, 2024 (Tuesday)
6:00 AM - 6:00 PM
Purpose

NGCP Preventive Maintenance


Areas Affected

WHOLE PROVINCE OF NUEVA VIZCAYA

July 19, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Clearing of Line


Areas Affected

Portion of BAMBANG (Depensa Calaocan, CFM, Homestead, San Leonardo, Barat, Salinas, Pallas)

Portion of KAYAPA (San Fabian, Acacia, Mapayao, Binalian, Babadi, Pinayag, Latbang, Nansiakan)

July 18, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Termination of 3 phase line from old to new lines, Clearing of obstruction of lines, and installation of isolation fuse cut outs


Areas Affected

Portion of STA. FE (Poblacion, Dalton, Tactac, Atbu, Imugan, Unib, Baracbac, Malico)

Malico, San Nicolas, Pangasinan

July 5, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Clearing of Lines


Areas Affected

Portion of BAMBANG
(San Fernando, Labni, and Mabuslo)

Whole Municipality of KASIBU

July 5, 2024 (Friday)
9:00 AM - 1:00 PM
Purpose

Installation of Fuse at Bambang Substation


Areas Affected

Whole Municipality of BAMBANG (except Indiana, Mauan, Aliaga, Almaguer North, Almaguer South, Portion of San Antonio North and NVPH)

Whole Municipality of KASIBU, DUPAX DEL NORTE, and DUPAX DEL SUR

Portion of KAYAPA (San Fabian, Mapayao, Binalian, Babadi, Pinayag, Latbang)

Magapuy, Bayombong

July 5, 2024 (Friday)
9:00 AM - 1:00 PM
Purpose

Correction of CT Ratio at Solano Substation


Areas Affected

Whole Municipality of SOLANO
(except Aggub, Commonal, Tucal, Uddiawan, San Juan, Portion of San Luis, Quirino, Poblacion South, Public Market and Breads N Bites to 24/7)

Whole Municipality of QUEZON

June 28, 2024 (Friday)
8:00 AM to 5:00 PM
Purpose

Replacement of broken pole and Clearing of obstruction of lines


Areas Affected

Portion of Aritao ( Balite and Calitlitan)

Portion of Sta. Fe (Atbu, Bacneng, Balite, Baliling, Buyasyas, Imugan, Poblacion, Sinapaoan, Tactac, and Villa Flores)

Malico, San Nicolas, Pangasinan

June 27, 2024 (Thursday)
8:00 AM to 5:00 PM
Purpose

Replacement of defective transformers, load splitting of overloaded transformers, and clearing of obstruction of lines


Areas Affected

Poblacion, Aritao

Public Market, Old Road Kirang

June 27, 2024 (Thursday)
8:10 AM - 12:00 NN
Purpose

Termination of Primary Jumpers and Clearing of Lines


Areas Affected

Portion of BAYOMBONG (Bansing, Don Domingo Maddela, Don Mariano Perez, portion of Don Mariano Marcos, Don Tomas Maddela, Portion of La Torre South, Luyang, Paitan, Salvacion, San Nicolas, and Vista Alegre)

NVSU Bayombong, DepEd

June 21, 2024 (Friday)
11:00 AM - 2:00 PM
Purpose

Replacement of broken pole


Areas Affected

Portion of BAMBANG (Portion of San Antonio North and San Antonio South)

Whole Municipality of DUPAX DEL NORTE and DUPAX DEL SUR

June 22, 2024 (Saturday)
8:00 AM -10:00 AM
Purpose

Replacement of Broken Crossarm


Areas Affected

Portion of BAMBANG
(Highway Homestead, Macate, Abian, Abinganan, Villaluz, Sto. Domingo, Magapuy, Sto. Domingo West, Manamtam, Magsaysay Hill, Portion of Banggot and Calaocan)

June 20, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Clearing of Obstruction on Backbone Line


Areas Affected

Portion of Diadi
(Bugnay, San Luis, Villa Aurora and Villa Florentino)

June 21, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Clearing of Lines


Areas Affected

Portion of SOLANO
(Portion of Aggub, Bangar, Bascaran, Concepcion, Curifang, Dadap, and Roxas)

Salubris

June 20, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Clearing of Lines


Areas Affected

Bascaran, Solano

June 19, 2024 (Wednesday)
8:00 AM - 5:00 PM
Purpose

Clearing of Lines


Areas Affected

Portion of QUEZON
(Kinalabasa and Busat, Runruno)

June 18, 2024 (Tuesday)
8:00 AM - 5:00 PM
Purpose

Clearing of Lines


Areas Affected

Portion of SOLANO
(Portion of San Luis, Aggub, Tucal, Uddiawan, San Juan, and Commonal)

June 22, 2024 (Saturday)
8:00AM to 5:00PM
Purpose

Clearing of Line


Areas Affected

District 4, Bayombong

June 20, 2024 (Thursday)
8:00AM to 5:00PM
Purpose

Clearing of Line


Areas Affected

Purok 6, Salvacion, Bayombong

June 18, 2024 (Thursday)
8:00 AM to 5:00 PM
Purpose

Clearing of Line


Areas Affected

Portion of Bayombong
(Portion of Salvacion and Portion of Don Mariano Perez)

June 14, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Clearing of obstruction on backbone and lateral line


Areas Affected

Portion of BAGABAG
(Calutlutan, Saranay, Sta. Lucia, Portion of Lantap, Bakir, Paniki, & Nangalisan)

June 14, 2024 (Friday)
8:00 AM - 5:00 PM
Purpose

Clearing of Line and
Rehabilitation of Line


Areas Affected

Portion of BAYOMBONG
(Portion of San Nicolas, SMU High School, and Cathedral)

June 13, 2024 (Thursday)
8:00 AM - 5:00 PM
Purpose

Clearing of Line


Areas Affected

Portion of BAYOMBONG
(La Torre South, Casat, Cabuaan)

June 12, 2024 (Wednesday)
8:00 AM - 5:00 PM
Purpose

Clearing of Line and
Replacement of Rotten Pole


Areas Affected

Boliwao, Quezon