Power Interruption Schedules
October 16, 2025 (Thursday)
8:30 AM - 5:00 PM
Replacement of rotten pole and extension of primary line
Areas Affected
Espino St., Roxas, Solano
October 11, 2025 (Saturday)
9:00AM - 12:00 NN
Clearing of Line
Areas Affected
Bagumbayan and Tanibung, Dupax del Sur
October 10, 2025 (Friday)
9:00 AM - 5:00 PM
Clearing of Line
Areas Affected
Kinabuan, Kimbutan, Biruk and Ganao, Dupax del Sur
October 9, 2025 (Thursday)
8:00 PM - 12:00 NN
- Clearing of Line
- Clustering of KWHM
Areas Affected
Tanibung and Manggayang, Dupax del Sur
October 7, 2025 (Tuesday)
9:00 AM - 5:00
Clearing of Line
Areas Affected
- Teggep, Binuangan, Mataddi, Yabbi, Gumyad and Kiyad, Dupax del Norte
- Nagtipunan, Quirino
October 06, 2025 (Monday)
9:00 AM to 4:00 PM
Replacement of rotten pole and clearing of line.
Areas Affected
Sitio Camarin, Nagtim-og, Diadi, Nueva Vizcaya
October 27, 2025 (Saturday)
8:30AM - 4:00PM
Clearing of Lines
Areas Affected
Sitio Sisi, Brgy. Pudi, Kasibu
October 10, 2025 (Friday)
8:30AM - 4:00PM
Clearing of Lines
Areas Affected
Brgy. Alloy (except Sitio Kappit), Kasibu
October 8, 2025 (Wednesday)
9:00AM - 4:00PM
Clearing of Lines
Areas Affected
Sitio Alimadin, Papaya, Kasibu
October 2, 2025 (Thursday)
9:00AM-5:00PM
Clearing of Lines
Areas Affected
Portion of Brgy. Poblacion, Brgy. Escoting, San Pablo, Arwas, Butao, Pinya, Langka, Villa Aurora, Villa Florentino, San Luis, Bugay
October 2, 2025 (Thursday)
6:30 AM to 6:30 PM
Substation Maintenance at Bayombong and Lagawe Substation
Areas Affected
Whole Province of Nueva Vizcaya except Alfonso Castaneda, Nueva Vizcaya
September 24, 2025 (Wednesday)
8:00 AM - 5:00 PM
Replacement of Rotten Poles and
Re-tensioning of 3 Phase Line
Areas Affected
Portion of SOLANO
- Portion of Osmeña
- Portion of Quezon
- Portion of Poblacion South
- Poblacion North
- Roxas, Aratal St. Quirino
- National Highway from Community Center to Seaoil)
September 20, 2025 (Saturday)
8:00 AM - 4:00 PM
Clearing of 3 Phase Primary Line
Areas Affected
Portion of BAGABAG
(Tuao North, Tuao South, Pogonsino, Singian)
September 19, 2025 (Friday)
9:00 AM - 4:00 PM
Replacement of Rotten Poles and
Clearing of Lines
Areas Affected
Portion of KAYAPA (Castillo Village, Tao-as, Balangabang, Tubongan, Besong, Kayapa Proper East, Kayapa Proper West, Amelong Labeng, and Talecabcab)
September 23, 2025 (Tuesday)
8:30 AM - 5:00 PM
Replacement of Rotten Pole and
Clearing of Lines
Areas Affected
Portion of BAGABAG (Kinacao, Villaros, Amballo North, Amballo South)
Portion of QUEZON (Dagupan)
Whole Municipality of DIADI
September 19, 2025 (Friday)
8:00 AM - 5:00 PM
Clearing of Lines and Relocation due to Road Widening
Areas Affected
Portion of Seguem (Calitlitan) and
Brgy. Muta, Kasibu
September 18, 2025 (Thursday)
8:30 AM - 5:00 PM
Replacement of Rotten Pole and
Clearing of Lines
Areas Affected
Portion of BAGABAG (Lantap, Bakir, Sta. Lucia, Portion of Villa Coloma, Nangalisan, and Paniki)
September 11, 2025 (Thursday)
8:30 AM - 4:00 PM
Relocation of Line Due to Road Construction
Areas Affected
Portion of Baretbet, Bagabag
(Purok 2, Baretbet including Barangay Hall)
September 6, 2025 (Saturday)
9:00 AM - 12:00 NN
Clearing of Lines
Areas Affected
Portion of DUPAX DEL NORTE
(Inaban, Parai, Bitnong, Oyao, Ganao, Sanguit, Macabenga, Belance, Binnuangan, Keat, Yabbi)
Mataddi, Nagtipunan, Quirino
September 6, 2025 (Saturday)
5:00 AM - 6:00 AM and 6:00 PM - 7:00 PM
To facilitate substation maintenance for 8Z-XF01BAY at Bayombong Substation
Areas Affected
Whole Municipalities of DIADI, BAGABAG, QUEZON, VILLAVERDE, SOLANO, BAYOMBONG, AMBAGUIO
Portion of BAMBANG (Sto. Domingo, Abian, Abinganan, and Portion of Macate)
August 29, 2025 (Friday)
8:00 AM - 5:00 PM
Installation of Additional Pole for Proposed Double Circuit Line
Areas Affected
Portion of SOLANO (Quirino and Baghabag)
Whole Municipality of QUEZON except Dagupan
August 29, 2025 (Friday)
9:00 AM - 1:00 PM
Conversion of Line from C1 to C14
Areas Affected
Gabut, Dupax del Sur
Portion of BAMBANG (Indiana, Mauan, Aliaga, Portion of Calaocan, Portion of Banggot, Portion of Homestead, Magsaysay Hill, Portion of Macate (SATY))
August 29, 2025 (Friday)
9:00 AM - 4:00 PM
Relocation of Anchor and Clearing of Lines
Areas Affected
Yaway, Aritao
August 28, 2025 (Thursday)
9:00 AM - 5:00 PM
Relocation of Line and Replacement of Rotten Wood Poles and Clearing of Lines
Areas Affected
Portion of STA. FE (Zigzag, Dalton, Tactac, Atbu, Dalton, Malico, Sta. Rosa
August 27, 2025 (Wednesday)
9:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Baan, Aritao
August 26, 2025 (Tuesday)
9:00 AM - 4:00 PM
Replacement of Rotten Poles and
Clearing of Lines
Areas Affected
Portion of STA. FE (Zigzag, Dalton, Tactac, Atbu, Malico, Sta. Rosa)
August 23, 2025 (Saturday)
8:00 AM - 3:00 PM
Clearing of Lines
Areas Affected
Portion of ARITAO (Sta. Clara, Anayo, Canabuan, Canarem, and Yaway)
Portion of STA. FE (Canabuan and Bantinan)
August 19, 2025 (Tuesday)
8:00 AM - 6:00 PM
Relocation of 69kV Line along Diversion Road
Areas Affected
Portion of BAYOMBONG (Bonfal Proper, Bonfal East, Bonfal West, Sta. Rosa, District IV, SMU, and Capitol Compound)
Portion of SOLANO (Portion of Quirino, Bagahabag)
Whole Municipality of QUEZON
August 16, 2025 (Saturday)
9:00 AM - 12:00 NN
Clearing of Obstruction of Lines
Areas Affected
Provincial Capitol Compound and Maligaya St., Sta. Rosa, Bayombong
August 15, 2025 (Friday)
8:00 AM - 5:00 PM
Conversion of single phase line to
three phase
Areas Affected
Almaguer South, Bambang
August 14, 2025 (Thursday)
8:00 AM - 5:00 PM
Single phase primary with underbuilt pole relocation due to building construction
Areas Affected
Portion of SOLANO (Along Washington St., portion of Osmeña, portion of Quezon and Wacal)
August 13, 2025 (Wednesday)
8:00 AM - 5:00 PM
Three Phase Line Rotten Poles Replacement
Areas Affected
Maddiangat, Quezon
August 13, 2025 (Wednesday)
8:00 AM - 5:00 PM
Clearing of Single Phase Line
Areas Affected
Bantay Wawa & Manamtam, Bambang
August 9, 2025 (Saturday)
8:00 AM - 5:00 PM
Replacement of Bare Wire to XLPE Conductor
Areas Affected
Portion of SOLANO (Lactawan, San Juan, Aggub, Tucal, Uddiawan, and Portion of San Luis)
Municipality of VILLAVERDE (Bintawan Norte, Bintawan Sur, Cabuluan, Ibung, Nagbitin, Ocapon, Pieza, Poblacion, and Sawmill)
August 9, 2025 (Saturday)
8:00 AM - 4:00 PM
Transfer of Distribution Line to 60-footer Poles
Areas Affected
Portion of BAYOMBONG (Bonfal Proper, Bonfal East, Bonfal West, Sta. Rosa, San Nicolas Extension, and Portion of Luyang)
Portion of SOLANO (Osmeña, Quezon, and Portion of San Luis)
August 9, 2025 (Saturday)
8:00 AM - 5:00 PM
Line Vegetation Clearing
Areas Affected
Portion of ARITAO
(Comon, Beti, Sta. Clara, Anayo, Canarem
Portion of STA. FE
(Canabuan and Bantinan)
August 8, 2025 (Friday)
8:00 AM - 5:00 PM
Payouting and transfer of load
Areas Affected
Almaguer South, Bambang
August 8, 2025 (Friday)
8:30 AM - 4:30 PM
Clearing of Line and Replacement of Rotten Pole
Areas Affected
Sitio Diso, Baretbet, Bagabag
August 8, 2025 (Friday)
8:00 AM - 5:00 PM
Line Vegetation Clearing
Areas Affected
Whole Municipality of AMBAGUIO
August 7, 2025 (Thursday)
9:00 AM - 12:00 NN
Transferring of Load
Areas Affected
Watwat, Kasibu
August 7, 2025 (Thursday)
8:00 AM - 5:00 PM
Replacement of Rotten Pole, Relocation of line due to road widening, and Clearing of Line
Areas Affected
Purok 2, Maddiangan, Quezon
August 7, 2025 (Thursday)
8:30 AM - 4:30
Correction of primary line and low vertical clearance
Areas Affected
Portion of BAGABAG
(Paniki, Bakir, Nangalisan)
August 7, 2025 (Thursday)
9:00 AM - 4:00 PM
Replacement of Rotten Pole and
Clearing of Line
Areas Affected
Malico, Sta. Fe
August 6, 2025 (Wednesday)
8:00 AM - 5:00 PM
Correction of low vertical clearance and
Clearing of Line
Areas Affected
Pao, Kasibu
August 5, 2025 (Tuesday)
9:00 AM - 3:00 PM
Relocation of Pole and Line Vegetation Clearing
Areas Affected
Sitio Cockpit, Alloy, Kasibu
August 5, 2025 (Tuesday)
8:00 AM - 5:00 PM
Replacement of rotten pole, relocation of line due to road widening, and clearing of line
Areas Affected
Purok 3, Baresbes, Quezon
August 5, 2025 (Tuesday)
9:00 AM - 5:00 PM
Clearing of Line
Areas Affected
Atbu, Sta. Fe
August 4, 2025 (Monday)
8:00 AM - 5:00 PM
Line Vegetation Clearing
Areas Affected
Purok 7, Baresbes, Quezon
August 4, 2025 (Monday)
8:00 AM - 12:00 NN
Line Vegetation Clearing
Areas Affected
Dalton, Sta. Fe
August 1, 2025 (Friday)
8:00 AM - 12:00 NN
Replacement of Primary Fuse Cut-out and Suspension Insulator
Areas Affected
Portion of BAMBANG
(San Antonio North and San Antonio South)
Whole Municipalities of DUPAX DEL NORTE and DUPAX DEL SUR
August 1, 2025 (Friday)
8:00 AM - 5:00 PM
Line Vegatation Clearing of Three Phase Line
Areas Affected
PLT / Bascaran / Bangar, Solano
August 1, 2025 (Friday)
8:30 AM - 4:00 PM
Correction of Low Vertical Clearance and Clearing of Line
Areas Affected
Latar, Aritao
August 1, 2025 (Friday)
8:00 AM - 5:00 PM
Reconductoring of Line and Clearing of Line
Areas Affected
Almaguer South, Bambang
August 1, 2025 (Friday)
8:00 AM - 12:00 NN
Correction of Low Vertical Clearance along Backbone Line and Clearing of Lines
Areas Affected
Portion of SOLANO
(Portion of Aggub, Bangar, Bascaran, Concepcion, Curifang, Dadap, and Roxas)
July 31, 2025 (Thursday)
9:30 AM - 2:00 PM
Correction of Primary Line and
Clearing of line
Areas Affected
San Luis, Diadi
July 31, 2025 (Thursday)
8:00 AM - 5:00 PM
Payouting of UB Line and Mounting of additional transformer
Areas Affected
Sitio Tupa, Salicpan, Salinas, Bambang
July 31, 2025 (Thursday)
8:00 AM - 5:00 PM
Line Vegetation Clearing
Areas Affected
Tayab, Kabinuangan, Runruno, Quezon
July 30, 2025 (Wednesday)
8:00 AM - 5:00 PM
Clearing of Line
Areas Affected
Unib, Sta. Fe
July 30, 2025 (Wednesday)
8:00 AM - 5:00 PM
Replacement of rotten pole and
clearing of line
Areas Affected
Purok 1, Mabini St. San Pedro, Bagabag
July 30, 2025 (Wednesday)
8:00 AM - 5:00 PM
Payouting of UB and
Line Vegetation Clearing
Areas Affected
Tupang, Nansiakan, Kayapa
July 30, 2025 (Wednesday)
8:00 AM - 5:00 PM
Line Vegetation Clearing
Areas Affected
Portion of VILLAVERDE
(Cabuluan and Portion of Nagbitin)
July 29, 2025 (Tuesday)
8:00 AM - 5:00 PM
Clearing of Line
Areas Affected
Baan, Aritao
July 29, 2025 (Tuesday)
8:00 AM - 5:00 PM
Line Vegetation Clearing
Areas Affected
Singian, Tuao South, Bagabag
July 29, 2025 (Tuesday)
8:00 AM - 5:00 PM
Line Vegetation Clearing
Areas Affected
Banggan, Solano
July 28, 2025 (Monday)
8:00 AM - 5:00 PM
Line Vegetation Clearing
Areas Affected
Purok 7, Baresbes, Quezon
July 26, 2025 (Saturday)
8:00 AM - 5:00 PM
Clearing of Line
Areas Affected
Pallas, Bambang to Nansiakan, Kayapa
July 25, 2025 (Friday)
8:00 AM - 8:30 AM and 4:30 PM - 5:00 PM
Transferring of Load of Bambang Substation
Areas Affected
Portion of BAYOMBONG
(Busilac, Buevavista, and Batuferry)
July 25, 2025 (Friday)
8:00 AM - 5:00 PM
Transferring of Load of Bambang Substation
Areas Affected
Whole Municipality of BAMBANG except San Antonio South and parts of San Antonio North
Whole Municipality of KASIBU
Portion of KAYAPA (San Fabian, Acacia, Nansiakan, Mapayao, Pinayag, Latbang, Babadi, and Binalian)
July 22, 2025 (Tuesday)
4:00 PM - 5:00 PM
Splitting of Load
Areas Affected
Namamparan, Diadi
July 22, 2025 (Tuesday)
1:00 PM - 3:00 PM
Splitting of Load
Areas Affected
Pinya, Diadi
July 22, 2025 (Tuesday)
10:00 AM - 12:00 NN
Splitting of Load
Areas Affected
Escoting, Diadi
July 22, 2025 (Tuesday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Whole Municipality of AMBAGUIO
July 26, 2025 (Saturday)
8:00 AM - 5:00 PM
Clearing of Line
Areas Affected
Whole Municipality of DUPAX DEL SUR
Malasin, Dupax del Norte
July 26, 2025 (Saturday)
8:00 AM - 5:00 PM
Clearing of Line
Areas Affected
Portion of ARITAO
(Comon, Beti, Sta. Clara, Canarem)
Portion of Canabuan, Sta. Fe
July 25, 2025 (Friday)
8:00 AM - 5:00 PM
Clearing of Line
Areas Affected
Yaway, Aritao
July 25, 2025 (Friday)
8:00 AM - 5:00 PM
Replacement of rotten pole and
Clearing of Lines
Areas Affected
Sitio Diso, Baretbet, Bagabag
July 24, 2025 (Thursday)
8:00 AM - 5:00 PM
Replacement of corroded pole and Clearing of Line
Areas Affected
Canarem, Aritao
July 24, 2025 (Thursday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Zamora Extension, Bayombong
July 23, 2025 (Wednesday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Buenavista, Bayombong
July 22, 2025 (Tuesday)
8:00 AM - 5:00 PM
Replacement of rotten poles and
Clearing for Lines
Areas Affected
Malico, Sta. Fe
July 19, 2025 (Saturday)
8:00 AM - 5:00 PM
Clearing of Line
Areas Affected
Mabasa, Dupax del Norte
July 18, 2025 (Friday)
8:00 AM - 5:00 PM
Clearing of Line
Areas Affected
Don Mariano Marcos, Bayombong
July 19, 2025 (Saturday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
PNRC, Baliling, Sta. Fe
July 18, 2025 (Friday)
8:00 AM - 5:00 PM
Replacement of Rotten Pole
Areas Affected
Ilang-ilang, Bone North, Aritao
July 18, 2025 (Friday)
8:00 AM - 5:00 PM
Reconductoring of Lines
Areas Affected
Portion of BAMBANG
(Almaguer North and Almaguer South)
July 17, 2025 (Thursday)
8:00 AM - 5:00 PM
Clearing of line and erection of additional pole
Areas Affected
Portion of ARITAO (Kirang Surong, Cutar, Nagcuartelan, Bone North, Bone South, Ocao-Capiniaan, Balite, and Calitlitan)
Portion of STA. FE (Atbu, Bacneng, Balite, Baliling, Buyasyas, Imugan, Poblacion, Sinapaoan, Tactac, and Villa Flores)
Malico, Sta. Fe, Nueva Vizcaya
July 17, 2025 (Thursday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Don Mariano Perez, Bayombong
July 16, 2025 (Wednesday)
8:00 AM - 5:00 PM
Transfer of Lines
(from old poles to new poles)
Areas Affected
Salinas, Bambang
July 16, 2025 (Wednesday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Escoting, Diadi
July 16, 2025 (Wednesday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Sinapaoan, Sta. Fe
July 15, 2025 (Tuesday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Purok 6, Baan, Kayapa
July 15, 2025 (Tuesday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Brgy. Caritas and Latbang, Kayapa
July 14, 2025 (Monday)
8:00 AM - 5:00 PM
Load Splitting
Areas Affected
Alimit, Kasibu
July 12, 2025 (Saturday)
8:00 AM - 1:00 PM
Rehabilitation of Line
Areas Affected
Cabarroguis St. and Purok 6 (Riverside), Dist IV, Bayombong
July 11, 2025 (Friday)
8:00 AM - 5:00 PM
Replacement of Pole and Clearing of Lines
Areas Affected
Potion of DIADI
(San Luis, Villa Aurora, & Villa Florentino)
July 11, 2025 (Friday)
8:00 AM - 5:00 PM
Upgrading of Lines and Clearing of Lines
Areas Affected
Portion of San Antonio North (Along Maharlika Highway), Bambang
Portion of Almaguer North (NVAT Compound, Bernabe Home), Bambang
July 11, 2025 (Friday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Magarang, Roxas, Solano
July 10, 2025 (Thursday)
8:00 AM - 5:00 PM
Clearing of Lines
Areas Affected
Malabing, Kasibu
July 10, 2025 (Thursday)
8:00 AM - 5:00 PM
Pole Relocation and Clearing of Lines
Areas Affected
Busat, Runruno, Quezon
July 9, 2025 (Wednesday)
8:00 AM - 5:00 PM
Replacemengt of Rotten Pole and
Clearing of Lines
Areas Affected
Purok Sampaguita, Banganan, Aritao